Exhibition Stand Handover and Defect Checklist

A structured pre-opening review helps distinguish incomplete work, defects and specialist inspections

Exhibition Stand Handover and Defect Checklist

The visual handover does not replace the required technical tests and certifications.

The final hours before a trade fair opens are often used for graphics, cleaning, product placement and technical commissioning at the same time. A short structured review makes it easier to distinguish unfinished work, visible defects and items that require specialist testing. Documents and reference information Approved layout and current drawing revision Latest furniture, graphics and equipment schedules List of client-supplied products and materials Current contact list and responsibility matrix Records or certificates required from specialist contractors Architecture and finishes Dimensions and main layout match the approved information Floors are secure, level and clean Walls, ceilings, counters and storage are complete and undamaged Doors, locks and moving components operate correctly Edges, corners and transitions are safely finished Graphics and branding Logos, colours, language versions and product names are correct Graphics are aligned, clean and free of visible damage Important messages remain visible from intended approach directions Dates, QR codes and links have been tested Furniture, products and operation Furniture quantities and positions are correct Storage, keys and staff equipment are available Exhibits are stable and accessible for demonstrations Routes for staff, visitors and service activities remain usable Technical systems Check the visible function of lights, screens, media, sockets and data systems. Formal electrical testing, structural verification, rigging approval, fire-safety checks and specialist commissioning must be completed by the responsible qualified contractors and documented where required. Record and prioritise defects Each issue should have a location, photograph, description, responsible party and deadline. Separate critical safety or operational issues from cosmetic items that can be corrected later. Confirm acceptance of any substitute materials or unfinished elements in writing. Close-out after opening Keep the final drawings, defect records and supplier contacts accessible during the event. Before dismantling, update the list for damaged, reusable, returned and stored components. Benatrix can provide local installation reporting and client-side handover support by agreement. View project coordination and local representation. Official venue information Koelnmesse eSlot and technical-guideline portal